For MRP Realty, we rebuilt the online experience of The Washington Harbour in Georgetown from the ground up, mobile first, along with a new brand identity. For Delon Hampton & Associates, a Washington engineering firm founded in 1973, we redesigned the public site to explain its long record of work and attract young engineers. For Volt Energy Utility, a renewable energy company headquartered in DC, we designed the brand identity, the logo and the website. As a Webflow Premium Partner, we build on Webflow, so your team can update listings, news and availability without a developer. The studio was founded by architects in 1993, works from Chevy Chase, Maryland, and has launched 400 websites.
How to choose a web design firm in Washington, DC
A building's website works for brokers, prospects and your own leasing team at the same time. Ask any firm these questions before you hand it the site.
Who updates the site after launch? Availability, floor plans and news change every week during a lease-up. If each change needs a developer, the site falls behind the building. Ask to see the editing screen your team would use.
Has the firm built for brokers? Tenant representatives want floor plans, specifications and a leasing contact within two clicks, and they often look on a phone between tours. Ask for a live site where that works.
Who makes the imagery? Renderings, film and photography do most of the selling on a building's site. Ask whether the firm produces them or takes them from other vendors, and who coordinates the handoff.
How will you know it's working? Ask which analytics the firm sets up at launch, such as Google Analytics and Search Console, and what it will report to you afterward.
Are accessibility and privacy part of the build? A public site should meet the WCAG accessibility guidelines and handle cookie consent properly. Ask whether both are in the price or quoted later.
Who owns it? The domain, the hosting account, the content and the design files should all be in your name.
What does a website cost in DC, and how long does it take?
The cost of a site follows its scope more than its page count. These are the main drivers:
- Page designs. A leasing site with home, availability, amenities and neighborhood pages needs fewer templates than a firm site with services, projects, people and news.
- Content collections. Each set of items your team manages, such as suites, projects or staff, needs its own structure in the content system.
- Integrations. Maps, availability feeds, CRM forms and leasing software each add build and testing time.
- Content. Copy, photography, renderings and film may be ready, or they may need to be made.
- Care after launch. Hosting, updates and monitoring are a separate monthly service.
We quote after a scoping call, once we know which of these your site needs. A typical marketing site takes eight to twelve weeks from kickoff to launch.